
MARINA RESORT, PORT DICKSON, NEGERI SEMBILAN
Admiral Cove Development Sdn Bhd
Reassessment of Report by Geotechnics Holland BV on Vacuum Consolidation for a reclamation project
1995
GEOTECHNICAL ASSESSMENT PUCHONG HEIGHTS
Pilihan Megah Sdn Bhd
Geotechnical Assessment for slope related stability for a hillside development.
BANDAR BARU MOSQUE, WANGSA MAJU, KUALA LUMPUR
Dewan Bandaraya Kuala Lumpur (KL CityHall)
Geotechnical assessment and foundation assessment. Reccomendations for a propesd Mosque. 1995
EXTENSION TO PELANGI BEACH RESORT PHASE 3, PULAU LANGKAWI
Equiplus Sdn Bhd
Alternative design for basement and raft foundation at Pelangi Beach, Pulau Langkawi. 1991
TAMAN TEKNOLOGI MALAYSIA
TTM/Ministry of Science, Technology and Environment
Geotechnical study aimed at site characterization for land use, facilities location and budgeting, for massive development lying on Krastic formation. Site consisted of areas with ex-tin mine ponds on Krastic formation and slightly hilly unduklating terrain. Following the study, the development was relocated using mainly the hilly terrain avoiding uncertain characteristics of ex-tin mine land. Documentation and Investigation supervision for Taman Teknologi at Bukit Jalil, Kuala Lumpur. 1991
DAMAGED CRIBWALL AT PASIR GUDANG, JOHOR
Perbadanan Kemajuan Ekonomi Negeri Johor
Geotechnical investigation, study re-design and construction supervision of a failed crib-retaining wall. 1990
DEVELOPMENT OF SECOND PHASE OF BANK SIMPANAN NASIONAL, KUALA LUMPUR
Saba Consult
1990:Geotechnical study and design of foundation and a three (3) level basement for a 25-storey office building in Krastic limestone formation along very busy Ampang road in city area.
GROUND SUBSIDENCE & FLOODING PROBLEMS ALONG RAILWAY TRACKS BETWEEN SALAK SOUTH AND SERDANG STATIONS
Keretapi Tanah Melayu (Malayan Railways)
1990: Geotechnical study, geotechnical investigation, design and supervision of remedial works for ground subsidence caused by sink holes overlaying limestone formation and flooding problems along KTM railway track between Salak South and Serdang Stations. Solution involved construction slurry wall to cutoff flow of water leaching sandy subsoils and installation of stone columns.
SLOPE FAILURE AND REMEDIAL WORKS
Rebak Island Marina Bhd
1994: Study of failure of perimeter slope of marina, remedial recommendations.
HOUSING DEVELOPMENT, AMPANG INDAH, SELANGOR
Jurutera TSSC Lim Sdn Bhd
1994:Slope stability and foundation study and evaluation for housing development at Ampang Indah, Selangor to fulfill MPAJ's guidelines.
Home Page Services Careers Documents Projects Humor in Engineering Our Clients the Engineer Slopes Made Simple News