GEOTECHNICAL

SLOPE STUDY FOR TAMPARULI-SANDAKAN ROAD IN SABAH
Jabatan Kerja Raya

Study of slopes along 300 km of road as part of consortium to come up with solution to mitigations and risks associated with slopes. The study involved usage of laser (LiDAR) mapping and development of Asset Database for slopes and development of Slope Maintenance and Risk Tracking system to be used for nation wide application. Development of Slope Performa Guide  2000-2004

SLOPE REHABILITATION STUDY FOR INSTITUTIONS UNDER MINISTRY OF EDUCATION
Ministry of Education

Study involved some 215 institution identified as having slope related problems in Pahang, Selangor, and Federal Territory of Kuala Lumpur. Study involved development of Database for slope related issues for every school under the study, identification of causes and recommendation of mitigations. Development slope database and maintenance of Manual for lay persons.1996-1998

ALOR STAR AIRPORT EXTENSION
KLIA
Re-assessment and re-evaluation of  land improvement involving repeat of Site Investigation and design of land improvement cumulating in considerable savings in construction costs for Alor Star Airport Extension and extension of runway.  2002-2003 40M

EAST WEST HIGHWAY: SLOPE REPAIRS

Jabatan Kerja Ra
ya
Repairs of some 141 massive slopes , design checks and construction supervision and stability re-assessments. solutions included horizontal drains, filter blankets, retaining walls, bored pile walls, anchors and host of geotechnical designs.1989-1994


MIXED DEVELOPMENT OF LADANG TELUK MERBAU, SEPANG SELANGOR DARUL EHSAN
Vintage Heights Sdn Bhd (Hong Leong Property)
,
Master Plan, Geotechnical Assessment Of Site Ground Improvement Using Marine Fill, Dredging And Coastal Structures

DISTRESSED SHEET PILED WALLS ALONG KLANG RIVER IN KL CITY
JPS (Department of Drainage & Irrigation)

Review , reinvestigate and Remedial designs for failing sheet piled wall along river bank adjoining main road link to KL City Cracks in roadway and movement leading to impeding collapse of a very busy highway  2001

SOFT SOILS ALONG JALAN CROSS BAN 4/JALAN SG. PANJANG, SABAK BERNAM, SELANGOR
Jabatan Kerja Raya (Public Works Department)

To study the technical and economical feasibility and provide Geotechnical solutions and a detailed design for the construction for a 20KM new road embankment founded on soft marine clay improved using vertical drains and geotextiles. 1997

HILLTOP CONDOMINIUM AT BANDAR PUCHONG JAYA  SELANGOR
Dynamic Management Sdn Bhd (IOI Group)

Geotechnical Assessment for geotechnical suitability of site for submission to Local Authority.1995