ENVIRONMENTAL
Continued
ENVIRONMENTAL IMPROVEMENT PROGRAMMES FOR SUNGAI GALING, KUANTAN,
Department Of Environmental (DOE)
This study identified the main issues causing the degradation of the river
basin. Short term and long term Environmental Improvement Programmes have been
proposed to improve the environmental quality of the river basin taking into
consideration of the opportunities and constraints within the basin.1998
1303 MW COMBINED-CYCLE POWER PLANT AT PASIR PENDEK, MANJUNG, PERAK
Sikap Energy Ventures Sdn Bhd
Environmental Impact Assessment for the power plant. This EIA addressed the
impacts of the power plant, especially cooling water discharge, light and noise
disturbance to the Turtle (Chelonia Mydas) landing site nearby and suggested
mitigation measures to reduce the magnitude of these impacts to the turtles.1993
SELANGOR MARINE INDUSTRIAL PARK AT KAPAR, SELANGOR
Hicom-Selangor Marine Management Sdn Bhd
Environmental Impact Assessment for the Marine Industrial Park, catering for
ship repairing, oil fabrication and other related industries. The development
covers an area of 4,181 acres along the coastal belt between Kapar Power Station
and Klang North Port Terminal. This EIA addresses the impacts of the development
especially on the mangrove forest and identified an area of approximately 600
acres of the project site to be preserved for eco-tourism.
1992
PERMANENT CAMPUS OF UNIVERSITI MALAYSIA SARAWAK AT KOTA SAMARAHAN
Universiti Malaysia Sarawak (UNIMAS)
Environmental Impact Assessment for 1,100 ha of proposed Permanent Campus of
Universiti Malaysia Sarawak. This EIA suggested that the existing wetland
forests within the project site be preserved for eco-educational purposes.1995
MEDICAL CAMPUS OF INTERNATIONAL ISLAMIC UNIVERSITY AT KUANTAN, PAHANG
International Islamic University Malaysia
Environmental Impact Assessment for 1,100 acres of proposed Medical Campus of
UIA at Kuantan. The medical centre of the campus necessitate the EIA to address
the need for proper handling of hospital and clinical wastes, in addition to the
normal impacts associated with the development. 1995
Master Plans Infrastructures Structures Sewerage Roads & Bridges Geotechnical Environmental Quality Assurance
We are at:
2A, PUSAT REKREASI SHANG VILLA, LOT G-3, JALAN SS7/15, 47301 KELANA JAYA, PETALING JAYA,
Selangor, Malaysia.
Telephone: 603 - 7806 1638, Fax: 603 - 7806 1138
E-mail: solutions@gea.com.my