ROADS & BRIDGES
NEW LOW COST TERMINAL AND ITS ASSOCIATED WORKS AT KUALA LUMPUR INTERNATIONAL AIRPORT, SEPANG, SELANGOR
Package LF05 - Terminal Approach Road
Package LF06 - Perimeter Roads and Security Roads & Fencing
Malaysia Airports Holdings Berhad
New road network development for the new Low Cost Terminal together with associated works at Kula Lumpur International Airport, Sepang. Detailed design and construction of approximately 20Km of road including road network outside the airport area and part of road works inside the airport area. (Perimeter Road and Security Road with security fencing). Part of this road system comes under perview of Public Works Department (JKR). The project is located on very soft peaty subsoils conditions which requires careful geotechnical site assessment and design of ground treatment. The road alignments consist of at grade and elevated roadways involving specialized and unusual designs and foundation solutions.
2009-ongoing
DETAILED DESIGN AND SUPERVISION FOR NEW EAST WEST HIGHWAY, PHASE 2 (PROJEK LEBUHRAYA PANTAI TIMUR FASA 2), (PACKAGE 5B CH60,000M (SERI BANDI) - CH 67,000M (KG. CHABANG), DAERAH KEMAMAN, TERENGGANU DARUL IMAN
Jabatan Kerja Raya (Public Works Department) JKR
Detailed design and construction of 7 Km new expressway (R6) two lanes dual carriageway along Lebuhraya Timur Fasa 2 (Package 5B CH60,000m (Seri Bandi) - CH67,000m (Kg. Chabang) and 2 bridges over Sg. Air Jernih.
The project team was awarded Best Project Management award to this Project team.
Oct 2007 - 2010
JALAN PERSEKUTUAN 8 BENTONG-KUALA LIPIS, PAHANG
Jabatan Kerja Raya (Public Works Department) JKR
Detailed Engineering design for Package 1, 5 and 8 of Bentong Kuala Lipis New Road, upgrading and widening of existing road in hilly terrain.
1995